Sinova Wastewater Treatment Plant, Soria.

OHLA has completed the construction phase of the new WWTP (Wastewater Treatment Plant) of Sinova (Soria) executing for ACUAES.

The new infrastructure is designed to benefit 185,000 equivalent inhabitants in the future. However, the part equivalent to 134,000 is being built, with a hydraulic capacity to treat an average wastewater flow of 24,000 m3/day. The new facilities include primary treatment with a capacity to treat six times the average flow (1.67 m3/s).