Construction of a new harbour in the Port of Alicante, with the creation of 30 Ha of esplanades (16 Ha completely developed) and 33 Ha of sheltered waters. The basin has 3 alingments of commercial quays and a ferry berth. As a summary, works included: 1,127 m of rubble mound breakwater, 442 m of secondary breakwater, 1,236 m of quays with caissons, 245 m of ro-ro berth for ferries, 160,000 m2 of paved esplanade and 1,986 m of railway track.